Working principle
Double cone mixer by double cone cylinder, mechanical seal, frame, deceleration transmission, etc., rotating double cone cylinder so that the material in the cylinder body produces disorder rolling mixing, so that the material in the cylinder body quickly mixed, mixing barrel can be arbitrarily tilted angle, easy to discharge and cleaning needs.
1. Let heat source (for example, low pressure steam or heat conduct oil) pass through the sealed jacket. The heat will be transmitted to raw material to be dried through inner shell;
2. Under driving of power, the tank is rotated slowly and the raw material inside it is mixed continuously. The purpose of reinforced drying can e realizd;
3. The raw material exists at the state of vacuum. The drop of team pressure makes the moisture (solvent) at the surface of raw material become saturation and will evaporate. The solvent will be discharged through vacuum pump an drecovered in time. The inner moisture (solvent) of raw material will infiltrate, evaporate and discharge continuously. The three processes are carried out unceasingly and the purpose of drying can be realized within a short time.
Product advantages
Double cone mixer is a new efficient fine container rotary, agitation type mixing equipment, for the uniform mixing of various powdery and granular materials, with a high degree of mixing, the amount of added ingredients can also achieve a better degree of mixing;
The machine adopts mechanical seal, the powder will not leak, and the bearing service life is long;
The machine has high mixing efficiency, high work efficiency, low labor intensity and convenient operation.
Technical parameters
Model | Full volume of mixing drum(L) | Loading coefficient | Motor power(kw) | Overall dimension (length × Wide × High)(mm) | Machine weight(Kg) |
CFW-2 | 2 | 40%-60% | 0.09 | 500×200×300 | 40 |
CFW-5 | 5 | 0.2 | 650×250×450 | 60 | |
CFW-10 | 10 | 0.37 | 800×300×600 | 100 | |
CFW-20 | 20 | 0.55 | 980×400×850 | 180 | |
CFW-50 | 50 | 0.75 | 1350×500×1100 | 380 | |
CFW-100 | 100 | 1.1 | 1580×650×1350 | 550 | |
CFW-200 | 200 | 1.5 | 1800×750×1650 | 680 | |
CFW -300 | 300 | 2.2 | 2050×850×1850 | 800 | |
CFW -400 | 400 | 3 | 2300×950×1850 | 1000 | |
CFW -500 | 500 | 4 | 2400×1050×2100 | 1200 | |
CFW -800 | 800 | 5.5 | 2500×1200×2300 | 1400 | |
CFW -1000 | 1000 | 5.5 | 2800×1500×2500 | 1800 | |
CFW -2000 | 2000 | 7.5 | 3400×1600×2700 | 2100 | |
CFW-3000 | 3000 | 11 | 3500×1680×2900 | 2400 | |
CFW -4000 | 4000 | 15 | 3600×1800×3100 | 2600 | |
CFW-5000 | 5000 | 22 | 3900×1900×3300 | 2800 | |
CFW -6000 | 6000 | 30 | 4100×2000×3500 | 3000 | |
CFW-8000 | 8000 | 37 | 4300×2200×3700 | 4000 |
Product Details
Operation precautions
1. The operator must be trained and qualified, and the equipment can only be operated after being authorized by the person in charge of the post.
2. The first time the equipment is started, the supplier's professionals need to be authorized or debugged on the spot.
3. There are certain dangers and hazards in the operation of the equipment, please operate with caution.
4. In order to ensure that the contents of the box are not polluted, the equipment needs to be installed in the workplace of the appropriate cleanliness level.
5. Before starting the machine for the first time, please clean up the environmental hygiene and equipment hygiene.
6. Users need to formulate relevant sanitary treatment procedures to ensure the quality of equipment work.
7. The electrical components of the double cone mixer are strictly forbidden to use water flushing method for cleaning and hygiene, please pay attention when using. In the case of power outage, it is required to clean the control cabinet/operation cabinet with a wet rag that does not shed fibers and does not contain combustible solvents or compressed air without water and oil, and wait for it to dry before it can be delivered to the operation.
8. When operating the double cone mixer, it should be operated independently by a single person, and it is strictly forbidden to cooperate with the two people to operate to prevent bumping and squeezing injury.
9. During the operation of the double cone mixer, if the parameter control is improper or the system components are out of balance, it may produce certain dangers, so it is forbidden to be unattended.
10. The barrel should avoid hard object tapping to prevent the cylinder from deforming and affecting the smooth operation.
Application range
It is suitable for the raw materials that need to concentrate, mix and dry at low temperature (for example, biochemistry products in chemical, pharmaceutical and foodstuff industries. Particularly it is suitable for the raw materials that are easy to oxidize, volatilize and have strong heat sensitive and toxic and not permitted to destroy its crystal in drying.
Maintenance and Upkeep
1. The equipment maintenance needs to have professionals, professionals need to hold the relevant nationally recognized operation certificate, and the maintenance personnel need to go through the maintenance training of the supplier.
2. In principle, it is not allowed to change the structure of the equipment during the maintenance process, and if it is necessary to change, it must communicate with the supplier and obtain authorization.
3. If the parts are damaged, the accessories of the same brand and model need to be replaced, such as the equipment damage and other problems caused by the replacement of different brands and models of accessories, the supplier will not be liable.
4. Users need to formulate relevant operation and maintenance procedures to ensure the long-term stability of equipment use. Maintenance personnel should carry out regular or irregular maintenance according to the requirements of the regulations. And the maintenance personnel should be relatively fixed to achieve the best working state of human and machine combination.
5. The reducer is refueled regularly, and the oil level should be high to the center of the oil mark.
6. After the reducer is carried for the first 150 hours, the lubricating oil must be replaced for the first time. Residual oil should be removed during replacement. Replace every 6 months thereafter.
7. The bearing is filled with grease, and it is checked and replenished every 6 months.
8. Regularly check and adjust the tightness of the chain and triangle belt; and apply mechanical oil to the chain.